eAIP

Taipei FIR

Consult Notam for Latest Information

R.O.C. Taiwan CAA

Information on this eAIP Package

Effective date : 08 AUG 2024

Publication date : 27 JUN 2024

Description

AIRAC AIP AMDT 04/24 (See complete AMDT in PDF)

Changes in this Issue

See AMDT tab for changes
Amdt tab

AIP
Summary
GEN – Differences, Aeronautical charts, Meteorological service. 
ENR – ATS Airspace, Significant points, ATS Routes. 
AD  – Aerodromes.

 
重要資訊及變更:
Signification information and changes:

 

ENR 3.4
ENR 5.5
新增宜蘭頭城地區無動力飛行運動活動空域資訊,配合修訂臺北飛航情報區小型航空器目視走廊飛航資料參考示意圖。Information on paragliding airspace Yilan County Toucheng Township Waiao Area is added. TAIPEI FIR SMALL ACFT VFR CORRIDOR FLT INFO REFERENCE CHART is revised accordingly.
GEN 3.3
ENR 3.1
ENR 3.3
ENR 4.4
ENR 6.1
1. R595航路新增GRACE-FANPY-KUDOS航段。
2. Q11 RNAV航路新增DRAKE-FANPY-TINHO航段。
3. 新增重要點FANPY。
4. 相關航圖配合修訂。
1. Route segment GRACE-FANPY-KUDOS is
added on ATS route R595.
2. Route segment DRAKE-FANPY-TINHO is
added on RNAV route Q11.
3. Significant point FANPY is installed.
4. Related Charts are revised accordingly.
AD 2 RCFG1. 修訂03/21跑道PAPI資訊,配合修訂機場圖。
2. 標準儀器離場程序
 a. HA1H更名為HAPPY 1A/1B。
 b. HA1X更名為HIPPO 1A/1B。
3. PT1標準儀器到場程序更名為PETRA 1。
4. 修訂LDA RWY03、NDB RWY03、RNP RWY03及RNP RWY21儀器進場圖。
1. Information on RWY 03/21 PAPI is updated. ADC is revised accordingly.
1. SID 
 a. Designator HA1H renamed as HAPPY 1A/1B.
 b. Designator HA1X renamed as HIPPO 1A/1B.
2. STAR designator PT1 renamed as PETRA 1.
3. IAC LDA RWY03, NDB RWY03, RNP RWY03, RNP RWY21 are updated.
AD 2 RCKH修訂LUGIA 1A/2B RNAV、POTIB 1A/2B RNAV及YANMA 1A/2B RNAV標準儀器到場程序圖。STAR Charts LUGIA 1A/2B RNAV, POTIB 1A/2B RNAV and YANMA 1A/2B RNAV are updated.
AD 2 RCLY1. 修訂跑道寬度及跑道頭經緯度。
2. 啟用跑道相關燈光設備。
3. 配合修訂相關航圖。


1. RWY width and threshold coordinates are revised.
2. Runway lightings are installed.
3. Related Charts are revised accordingly.
AD 2 RCMQ修訂18跑道ILS GP及DME相關資訊。Information on RWY 18 ILS GP and DME is revised.
AD 2 RCMT修訂03/21跑道APAPI及PAPI資訊,配合修訂機場圖。Information on RWY 03/21 APAPI and PAPI is updated. ADC is revised accordingly.
AD 2 RCQC1. 修訂停機坪強度。
2. 新增航管監視最低高度圖。
1. The strength of apron is revised.
2. ATCSMAC is added.
AD 2 RCSS修正EH, E1滑行道寬度、鋪面與強度。The width, surface and strength of TWY EH and E1 are revised.
AD 2 RCTP1. 修正機場管理單位電話號碼、傳真。
2. 啟用Q滑行道(Q2與Q4滑行道之間),配合修訂相關航圖。
3. 修訂RNP RWY05L、RNP RWY05R、RNP RWY23L及RNP RWY23R航空資料表。
1. The telephone and telefax of AD Administration are revised.
2. TWY Q (BTN TWY Q2 and Q4) installed. Related Charts are revised accordingly.
3. Aeronautical Data of RNP RWY05L, RNP RWY05R, RNP RWY23L and RNP RWY23R are updated.

 

  • Hand amendments
    NIL

  • Record entry of AMDT on the page GEN 0.2-1

  • The following publications have been incorporated in this amendment:

AIP SUP20/24
AICNIL
NOTAMNIL